AIG-011 AI System Decommissioning
Description
A documented decommissioning procedure exists for retiring AI systems. The procedure covers: notification to affected users and operators, data deletion or retention consistent with the organisation's data retention policy, archival of technical documentation and evaluation records for the required retention period, and verification that automated pipelines or downstream integrations have been removed or redirected. Decommissioning is logged and signed off by the system owner.
Rationale
Retired AI systems that remain partially active (orphaned model endpoints, residual data pipelines) create unmonitored risk; decommissioning must be a controlled, auditable process.
Framework Mappings (2)
| GOVERN 1.7 | AI System Decommissioning Processes | full |
| MANAGE 4.1 | Post-Deployment AI System Monitoring | partial |
Evidence (2)
Completed AI system decommissioning record for a recently retired system, documenting user notification, data deletion or retention actions, pipeline removal verification, and system owner sign-off.
Example: Decommissioning Record — Legacy Sentiment Classifier v1 (Confluence), dated 2025-12-15, showing user notification sent, model endpoint terminated, training data retained per data retention schedule, pipeline integrations confirmed removed, signed by AI Product Owner
Test: Request the decommissioning record for the most recently retired AI system. Verify: (1) affected users or operators were notified, (2) data deletion or retention decisions are recorded and consistent with the retention policy, (3) technical documentation and evaluation records are archived for the required period, (4) downstream pipeline integrations are confirmed removed (reference to infrastructure change record), (5) system owner sign-off is present and dated.
AI system decommissioning procedure defining the required steps, notification requirements, data handling obligations, and retention periods for technical documentation of retired AI systems.
Example: AI System Lifecycle Policy — Decommissioning Section v1.0 (Confluence), covering notification timeline, data deletion workflow, documentation archival retention period (minimum 5 years), and owner sign-off requirement
Test: Request the decommissioning procedure. Verify: (1) procedure covers notification, data handling, documentation archival, and pipeline removal steps, (2) retention period for archived documentation is stated and meets regulatory minimums, (3) sign-off requirement is specified, (4) procedure applies to both internally developed and third-party AI systems.
Questions (2)
Does your organisation have a documented procedure for decommissioning AI systems?
Retired AI systems that remain partially active — orphaned model endpoints, residual data pipelines — create unmonitored risk. Decommissioning should be a controlled, auditable process with system owner sign-off.
Which of the following steps does your AI system decommissioning procedure require?
All five steps should be present. The most commonly missed is verification of downstream pipeline removal — orphaned integrations calling decommissioned endpoints are a recurring production incident pattern.